| Operate diagnostics |
(HTML) |
| Tune the DRAGON separator |
(HTML, Postscript) |
| Use the separator hardware |
(HTML, Postscript) |
| Condition the electric dipoles |
(HTML, Text) |
| Targets |
(HTML) |
| Calibrate the BGO array |
(HTML) |
| Change the threshold for the BGO array |
(HTML) |
| DSSSD energy calibration graph |
(Graph (PDF), Text, Full Report (PS)) |
| Calibrate the DSSSD |
(HTML) |
| Operate the DSSSD |
(HTML) |
| Operate the ion chamber |
(HTML, Text) |
| The MCP (Micro-Channel Plate) |
(HTML) |
| MCP foils |
(HTML) |
| Remove the High Voltage stacks from the EDs |
(HTML) |
| Install/Remove a DSSSD |
(HTML) |
| The Hybrid Detector |
(HTML) |
| Status of DSSSDs |
(HTML) |
| Status of surface barrier elastic monitors |
(HTML) |
| Connections to Scalers |
(HTML) |
| Replace the 'Wobbler' (SM0) |
(HTML, Text) |
| Follow Lock out procedures |
(HTML) |
| Access to the new DRAGON Radioactive Source Safe |
(HTML) |
| IC window inventory |
(HTML) |
| How to use the TOTAL survey station |
(Text) |
| Use the MIDAS data acquisition system |
(HTML) |
| Viewing histograms |
(HTML) |
| DragonRoot offline sorting |
(HTML) |
| Restart after a power outage |
(HTML) |
| Writing data to tape during a run |
(HTML) |
| Back-up and restore data to and from tape |
(HTML) |
| ROOT Macro for MD1 Energy Calibration |
(HTML) |
| Run and use NOVA |
(HTML) |
| Use the EPICS control system |
(HTML) |
| Administer the DRAGON website |
(HTML) |
| Use and administer the DRAGON forum |
(HTML) |
| Use Ahmed Hussein's two-body kinematics program |
(HTML) |
| Calculating Simulated Efficiencies for the DRAGON Gamma Ray Array |
(Text) |
| Creating cuts in the dragon analyzer |
(HTML) |
| Online calculator: MD1 energy and tune ratios, ED1 A/q, R and yield |
(HTML) |