DRAGON Public DRAGON Private Forum Experiments Documentation Operator Information Contact Information
Documentation

DRAGON Minutes

For instructions on how to upload minutes to the DRAGON website, click here.

2002 2003 2004 2005 2006 2007 2008 2009

Technical Notes

Title Date Document
  • GEANT Gas Target Profile - Chris Ruiz
  • February 2006 PDF (291KB)
  • DAQ Electronics' Final Drawing Documentation (Joel Rogers Memo)
  • Jan. 6, 2004 PDF (723KB)
  • Location of FCM2
  • Apr. 4, 2003 PDF (608kb)
  • DRAGON Power Supply Calibration
  • Feb. 28, 2003 PS (253kb)
  • DRAGON Beam Normalization Study
  • Jan. 21, 2003 PS (192kb)
  • ISAC Beam Energy Measurement using DRAGON MD1
  • Dec. 20, 2002 PS (167kb)
  • The Gas Target Density Profile
  • June 3, 2002 PS (135kb)
  • The DRAGON Recoil Separator Optics
  • Jan. 3, 2001 PDF (9.3mb)
  • Performance of DRAGON's Gas Target Recirculation System
  • Dec. 14, 2000 PS (1.1mb)
  • X-rays from the DRAGON Facility
  • Jan. 29, 1999 PS (373kb)