Minutes DRAGON meeting May 15 2007 present: DH, CD, PM, GR, CR, MT, AH, DFOT, LB, CV (recorder) 0) previous minutes accepted with 1 modification: High Voltage Drivers, *not* Dividers 1) Hardware: Total station: survey of the top positions almost finished a small design error was made for the side pieces, extension pieces had to be made transformation to usable coordinates not clear now, needs to be a two step process DSSSD calibration: next week DFOT will buy double filament ion gauges from the VARIAN credit (CAD 1,431.00) Mitutotyo - installation almost finished, no progress on serial readout, but device can be read out locally Roots blowers logic - Mike Le Ross changed EPICS logic, will be tested soon TUDRAGON test will be delayed until alpha acceptance studies and FEBIAD beam time in June are finished Box DB14 for TUDA - installation of a stripper foil for fully stripping to reduce 18O contamination Plan for the next weeks: 2 weeks of alpha acceptance studies to reproduce the current status (no simulations) 1 week ion chamber installation with Mylar window conditioning of ED's during IC installation and unused nite time during alpha tests (180 kV at ED1 is desirable) no Ge detectors at DRAGON, but at TUDA 2) 16N article by LB et al.: a new paper is going to be published in PRC on the ~10yr old Yale data with highly questionable interpretation. LB and GR are using GEANT simulation to model the experimental data and preparing a paper on remarks about the Yale paper. 3) AOB: CV: first 40Ca paper now published in NIM B after almost 2 years. GR: life-time paper on Na-22 almost ready for submission TUDRAGON future: an actable strategy for solving Tudragon problems should be ready for discussion and implementation in June