DRAGON meeting 10 Mar 2009 present: DH, CD, LB, PM, KO, GR, UH (rec) Hardware: * new VME system: - new crate is in - 2 ADCs, 1 TDC - some special cables needed, half of them are already made - new modules are wired into the trigger - currently everything goes into both systems - KO is working on intergrating the new system into the analysis system - create .mid files that look like the old ones Beamtime: * test beam time - test new VME setup, turn off FERA - DH suggests Ne21, resonance at ~768 keV/u * summer F18 - distinguishing F18 and O18 will be difficult, T1/2(F18) ~ 110 min - TUDA used dE-E in a foil, but this would be difficult to implement at DRAGON - use IC for particle ID