June 5th Dragon Minutes Recorder: AG Previous minutes: accepted without changes. XSLITC: (DO) Calibration can be zeroed on Mitutoyos. There is hysteresis in moving the slits: stepping motor turns about 1/8 rev in a new direction before the actuator begins to move. This is equivalent to about 0.4mm. In addition there is a similar backlash between the actuator and the Mitutoyo readback, due to flex in the actuator tube. Building a different mount to reduce in half, or better. Setting width and position in EPICS is fine except for the motor-actuator hysteresis: should set Offset to -0.5mm in EPICS slit control of XSLITC to be centred according to optical survey. Alpha Tests: (AG, MJ) Slowly coming along. Some issues with cooling system and noise. Counts are a few higher than Chris had previously (~23/s at peak with 8mm aperture removed, mass slits 3mm). (DO) Need a fix for the ethanol refrigerator. Ethanol seems to be evaporating leaving only water, leading to ice. Draft paper Ca-40: (CV)Not all authors have a copy of the paper yet. Some comments back. This will be discussed next week Ion chamber: (CV) Have one thick mylar window available and can get a foil. Solar Cells: Cable length 6ft has been specified to the Electronics Shop. If more needed can use ribbon cable. SIMION: (AG) Nothing done yet. Vibrating Wire: (MJ) Have a concept for mounting the ends of the wire with x-y motion, without having to dismantle separator. Everywhere there is a BCM can do this. In next 10 days can do testing. Other Business: Na-22: Cyropump with loose activity. Aim to be able to ship it to Seattle within a month.