Minutes of the DRAGON Meeting 15 July, 2008 Present: CV,UH,GR,LB,DH,CAD,DO,PM,PB CR unavailable due to injury 1. Plans for fixing MCP foil and FCF FCF is now unplugged -- DO will tackle. MCP foil -- probably same thing as happened two weeks ago, CV UH says there is one spare; but CR had already taken one (?), he is expected back tomorrow. CR has contacted Controls but they have not replied re: his list (see previous minutes, not mentioned above). 2. E810 Party Line, good points to mention: i) We can separate recoils from leaky beam. ii) Calibration of the RIB monitors. iii) 1.5x10^8 ^{23}Mg at one point, but dropped to few 10^7 then dwindled to a few 10^6 iv) Na/Mg quite good But, beam got less after each proton trip. 3. TRILIS DH interpretation of what was happening; seee attachments