Minutes of meeting held on Jan. 25, 2005 at 10:30 Present: JDA, MT, DH, CV, CR, PM, LB, Katalyn,DO, JP, GR, DG, AO, WRH (recorder) 1. Minutes of meeting of Jan. 18, 2005 (circulated previously) accepted (no comments) 2. DRAGON Hardware -Status of Small Beam Tube on new MEBT Dipole for ISAC-2 beam takeoff circular hole 1 1/8 inch diameter instead of 2 inch they may have forgotten taking the beam to DRAGON; Laxdal concerned vacuum tank to be modified to allow for a ~square opening stable beam test: end of february, depending on accelerator status We will also seek some RB to test effects of beam halo on leaky in DRAGON - News on the LIS for Al beam front excitation scheme for Al has been demonstrated at ISOLDE ISAC needs the solid state pump laser $60000 (Jens Lassen) could be very good efficiency: 70 times the surface - New idea: upgrade for OLIS (CV) 26Al from ORNL, 1 uC put into OLIS, ionize; estimated price: 20000 US$ number of atoms: 10^18, so 10^16 to accelerate rough estimation: 1 meV needs 10^12 go down by factor 20 => 10 nA good beam perhaps improvement of factor 7 => good - leaky beam supressor after MD2: DH and DFOT will install manual type slit 3. Projects in Progress - Suggested additional upgrade of IC (CV) addtional upgrade, currents not affected, change the anode plates make some small boards (detector preamps), R. Openshaw has some plates time required for the upgrade: at least one month 4. Discussion of Beam Requests and related matters - Beam Requests: CR: Si (stable beam): 2 days for CSD + beam dev, 2 days for testing Al samples read current, integrate with FC, measure efficiency Al (radioactive ground state): 42 shifts (4 weeks) time depends on beam current (status of LIS) JC: 23Na; for studies of implantation studies then use DRAGON with a proton beam (H3) to test implanted target CV: 40Ca (low energy stable beam): beam development determine the beam contamination with 40Ar then strong resonances DH: Ne20 for completing p,gamma study' disagreement with literature now DH: need a beam for wobbler studies also...could be Ne20 UG: Ne19 RB, (??) AC: Al25 RB, will request beam for scattering and initial P,gamma tests - Related Matters: DRAGON wobbler test (?) schedules of beam time would be helpful Be request prestripper in HEBT line - Elastic Detector for MEBT (CR) CR will present the plans next week at the ISAC-forum 5. E952 Group Meeting: Lothar - Plans and Decisions (see attached "E952_Outline.pdf") build analysis directly into GEANT implementation in GEANT and in the analyzer has to agree analyzer has to be rewritten in MIDAS (ROOT would be optimal) Katalyn will do GEANT simulations CR is going to program in the analyzer and then analyze the data group working on this: DH, CR and AO Katalyn, CR, Uwe look at the implementation of the e+e- record - Beam Normalization (WRH) (see attached "Elastic_Detectors.pdf") elastic detector EM1 is probably damaged, should be tested R-matrix output has to be transformed to the He-lab_frame 6. Other Issues: - Beam Priority: Ne, Na, H3, Si (needed for Al), Ca, Al, Carbon(?) - 12C+12C (JP) - 12C+16O: not decided meeting closed at 12:08