Dragon meeting Jan 22 2008 Present: DH, CD, LB, PM, DFOT, UH, GR, LE, CV (recoder) 1) previous minutes accepted 2) upgrade of end station: order turbo unless PM¡¯s idea using the vent port on the TP works machine shop: no priority, but CR listed our priority of the parts (first ¨C parts needed to relocate the FS box, second ¨C mods on MCP 1, third ¨C MCP 2 and DSSD box) 3) positioning of alpha source - parts are made, should be ready soon. PM suggests to make a separate cover plate for the positioning 4) beam time requests: 20 shifts of radioactive beam (23Mg) + stable beam; 8 shifts of stable 33S 5) transmission studies: DH: polarity of SM1Y confirmed to be right; UH: max transmission between charge and final slits is 86%; need to record field strength of these measurements for future reference; comparison with GEANT and previous measurements 6) DAQ stuff: LE: several different tasks: maintenance programming like move to rootana; recoding epics events with higher frequency for a short time interval (for FC readings); defining ROIs in histograms as a gate for other histograms (will use last 23Na(pg) run as an example); documentation of DAQ