DRAGON Meeting Minutes - 16 January 2007 2pm, board room Present: DO, DH, XX, LB, JDA, PM, GR (rec.), CR, CV 1. Minutes of previous meeting and business arising No errors or corrections 2. Hardware Total survey (DH) --> see att. 1. We can mount corner cubes and total stations at points A, B, C, and D, see att. 1. It should be possible to measure moves in fraction of a mm. We will drill 3 holes on top of MD1 & MD2. Will discuss this with Bruno on Friday. This kind of total alignment checking has not been done before. XIA (CR) The XIA system would be a simple standalone DAQ for 22Na(p,g). Couldn't get it running. Exactly Win2000 SP2 is needed. However, Even this doesn't work. Chris will ask the company for newer drivers. Mitutoyo (DO) Company could not answer the question if battery is rechargable. New one costs 1600 CAD (or US$?). TUDRAGON (DH) 17O(p,g) will be the first TUDRAGON run. Need to use LEDAs in DRAGON Detector box (PM) Leaking through the feed-throughs. We need a list of costs. Jan 29 is dealine for budget as well as for annual reports. Further proposals for ARs: - 12C(a,g) - Acceptance measurements with beam - CSD measurements - 40Ca 3. Beam requests for May-August schedule FEBIAD + SiC: Beam requests for 18F, 17F, 19Ne (Uwe), and 18Ne ECR / OLIS: Beam requests for 17O, 25Mg, 23Na 4. REA-747 (solar cell surveyor) design (LB) --> see att. 2 LB presented a 3D-drawing for the solar cell mount. Things to clarify: What connectors/cables (LEMO?), what preamps? We need a prototype with only 1 strip first. 5. Other business CV: We can make thick carbon-like foils for TOF detection Meeeting ends 3:20