Present: Chris Ruiz (CR), Christof Vockenhuber (CV), Dave Ottewell (DFOT), Goetz Ruprecht (GR), Lothar Buchmann (LB), Peter Machule (PM), Mike Trinczek (MT), John D'Auria (JDA)-recorder, Agenda: 1. Minutes of previous meeting and business arising 2. Acceptance measurements - part II (CR) 3. 20Ne(p,g) analysis (MT) 4. Other business -Mitutoyo? (DO) -REA-747 (LB/CR) -DGF/XIA !!! (CR) -schedule 111 (CR) 1. Minutes of meeting of Feb. 3, 2007 a. Corrections: CR working on 22Na report b. DM worked on cleaning the motor drives 2. Acceptance Measurements a. CR presented his report on Acceptance studies using the Gd source. Report had been circulated previously. b. Settings on ED1 seem to be slightly off. c. Correcting small acceptance problem doable for future runs. d. DO suggested that perhaps a quad is off and he will check. e. Further measurements are planned by CR using the standard tune and will report further next week. 3. 20Ne(p,g) a. MT still working on this. There seems to be a problem using ROOT and JP needs to be contacted. 4. Mitutoyo:a. DO making progress with no major problems 5. REA-747: Solar cell test system being assembled by Brian Evans group. The complete system needs to be ordered. 6. Schedule a. Revised beam schedule has been circulated. DRAGON does not get any radioactive beam before the fall, 2007 and perhaps not then either. b. Apparantly two labs has recently completed 17O(p,a) and (p,g) studies and the need to do this study is decreasing. c. TUDRAGON experiment in the works but a game plan would be useful soon. Simon Fox visits next week and perhaps can advise. 7. DGF/XIA a. It seems that the XIA is not working well so others systems being tested. GR will report on these next week. 8. Status of 40Ca Data Analysis: Going very slow at McM. 9. FC4 Cup tests a. MT reported on push to study the operations of FC4 using a adjustable current supply to test reproducibility. 10. Meeting adjourned at 15:14. (Lake Louise practice presentation by JZ)