DRAGON minutes, Th, Feb. 12, 2008 Meeting begins at 14:00 Present: DO, DH, CD, LB, PM, UH, CR, CV, GR (recorder) 1. Status of DRAGON/Hardware/Workshop jobs (CR) - Side plates are finished - Cover plate finished - New MCP top plate is finished but w/o feedthroughs - See attachment "timeline.txt". 2. Discussion of work required/timeline for upgrade (CR) - DSSSD out - MCP out - Move ion chamber to a safe place. Mark the last position! - Can't be moved w/o permission to disconnect electricity - Chris will provide a plan next Monday. - DO: When is the gate valve needed? Before vacuum testing. 3. Discussion of annual activities/schedule - CR made a 2008 year plan. See attachment "Dragon2008.pdf". - We still need a 21Na beam for the 23Mg run beta calibration - DH: Maybe some time in Sept. for DRAGON, stable beam (31P)? LB: Needed for TACTIC - CR: Need to ask Uwe what students are available for the 23Mg run. - Will send an email asking everybody for availability 4. A.O.B - 22Na grant is being considered, looks positive - CR Still doing simulations for the mesh. With 10 foils we should get the attenuation we need. So far, it will not screw the acceptance by elastics. - DH was talking with Pierre and Marek. With Ca-O oxide target 30P would probably be the dominant species. Otherwise, we need radioactive 32P for testing. Could be produced at TRIUMF's fast neutron source - We need to upgrade our website. (Some people suggest it...) Meeting ends at 14:52