DRAGON minutes 05 Aug 2008 Present: DH, CD, SF, GR, CR, PB, UH (rec) Hardware * all dipole sections are pumping down, as is the gas target and the ionisation chamber * EDs conditioning up to to 150/130 * final slit box vacuum at 1.5e-6 T (should be 10-7), find PM tomorrow for leak checking * IC window and MCP foils seem to be ok preparation for beam time (S33 from OLIS) * cool down trap, put in hydrogen * beam earliest on Friday, will be decided this afternoon; we asked for 3 shifts, * run plan: do CSD attenuated beam runs to check IC measure the 3 high-energy resonances at different charge states * expected beam: 5e9 /s AOB * EPICS: the scaling only works via the direct connection on isdaq04, the programme should only be used there * SF will give his presentation on Friday * the mini shutdown will be one week later than originally scheduled