DRAGON Meeting Minutes - 17 April 2007 2pm, ISACII Ops Room 249 Present: GR (recorder), PM, AL, TD, DH, DO, PW, LB, PM (TD = Tom Davinson, AL = Alison Laird) 0. Minutes - Only some typos 1. Hardware - XSLITC linear scale: DO: Stand will be finished very soon. Frame under vacuum box ready to be mounted. - PM: Small water leak at Q1. 2. Discussion of preparations/requirements for "Tudragon" Run. - DH: Gas tests still ongoing. See previously circulated report. (Dave's email, April 17) - Installation progress TD: Plan is: - Test detectors in vacuum - Fill with gas, test again. Run plan will be circulated by Rachel (attached). Dragon will be used only for tuning and energy measurement. Then using FC1 for normalization and beam dump. - Safety report done by PW - Elog (GR) To use the TUDA elog: Go to http://elog.triumf.ca/Tuda, press "Register as new user", and submit the filled-out form. You are immediately able to read the elog entries but not to modify or create new entries. GR receives an email notification for newly registered users and will add them to the write permission list. During the run, if you make a new entry, make sure that E1106 is selected (it should be selected by default). - Shift schedule will be provided by Rachel Meetings ends at 2:50