Minutes of the DRAGON meeting of 3 April, 2007 Present: CD, CR, MT, LB, DH, PM, DO, Stefan Sch., PW (TUDA) - Minutes of the previous meeting, approved with no changes - Hardware CCD camera knocked out of alignment. CR had problems setting up the DSSSD detector for calibration. Suggests that we clearly label connectors to make sure they are put in correctly. Also, put polarized connectors on cables. Final slit box still coming down; exhibits ``anti-burps'' in vacuum. - 22Na targets Moved Thursday morning. DO & CR & Susy removed box and found different dimensions to previous different sets of dimensions; bigger, requiring modification of design. Concerned that chamber had leaked up to air. Activity was as expected. Swipe tests were negative on box surfaces; 250 cts./min. on Faraday cup. CR shows design from Cory. - DH, inner & outer vessels are welded. PW reports that inside surface of outside box -- surface as if for an O-ring is slanted (coupling that goes to TP's?). DH says that this is just where two machined surfaces come together. Machinist does not wish to correct; but wants to move on to keep the schedule. . . . other TUDA discussion, not recorded. - CR: 2 PA's only mentioned on pro forma invoice of equipment shipment. Otherwise list is complete. - Vibrating wires; maybe before 23rd (PM). -AOB CR: solar cells arrived today. Brian Evans is away for ~2 weeks. Is there anybody who can do the soldering? Revision of design to fill in the gaps.