DRAGON Meeting Minutes - 27 November 2007 2pm, MOB boadrd room Present: DH, CD, LB, PM, UH, CR, CV, GR (recorder) 0. Minutes Nothing said about previous minutes 1. Quad alignment status CR: Got Total Station from Bruno Gaspari, initial measurements look ok. 2. MCP and DSSD designs (items to purchase?) - New MCP box has 2 mirrors now (see attachment) - The alpha source upstream can be retracted - We need to buy/machine: * An alpha source * 2 ladders PM: 2 spare ladders might be available, will check... * SHV Feed-througs - Small DSSSD box: - How do we bring DSSSD and IC entrance window mutually to the same z-position? DSSSD will have a door mechanism for ease of access. DSSSD box will have independent pumping system based in gate valve - same for IC when installed. DSSSD box will be moved out of the way when IC installed. . Therefore, the shopping list continues: * Small turbo pump * Special KF40-containing gate valve 3. A.O.B Meeting ends at 2:40